View Single Post
Old 11-30-2008, 10:44 AM   #2
Tea cups
Scooby Specialist
 
Member#: 103136
Join Date: Dec 2005
Default

procedure for P2009 for your car:

STEP:
1 CHECK HARNESS BETWEEN ECM AND
TUMBLE GENERATOR VALVE ACTUATOR
CONNECTOR.
1) Turn the ignition switch to OFF.
2) Disconnect the connector from tumble generator
valve connector.
3) Measure the voltage between tumble generator
valve actuator and chassis ground.
Connector & terminal
(E51) No. 1 (+) Chassis ground (��):
(E51) No. 2 (+) Chassis ground (��):

CHECK
Is the measured value less
than 5 V?

YES
Replace the tumble
generator valve
actuator. <Ref. to
FU(H4SO U5)-31,
Tumble Generator
Valve Actuator.>

NO
Repair the battery
short circuit
between ECM and
tumble generator
valve actuator.
* Registered users of the site do not see these ads.
Tea cups is offline   Reply With Quote