View Single Post
Old 04-27-2001, 06:26 PM   #15
RimRockaz
Scooby Specialist
 
Member#: 2947
Join Date: Nov 2000
Location: El Cerrito, CA
Vehicle:
2000 GC6 ej20 swap
fast n furious pt III

Post

FYI, the Morroso battery relocation kit that i got came w/ tie down bolts and a ventilation tube. the installation took me about 1.5 hour. some drilling required.
* Registered users of the site do not see these ads.
RimRockaz is offline   Reply With Quote