Project Update for July 23, 2012: A lot of hours and late nights have gone into this project in the past 7 days. Plumbing, flares, suspension, and more. Let's get everyone caught up on the last week of Vorshlag work on Brianne's Corn's hill climb Subaru (including Brianne, who is also watching our work progress online) by the crews here at Vorshlag joined by our hose and fitting experts.


Major Plumbing Upgrade Work

The crew from Pirtek Plano South have burned a couple of nights and most of last Saturday at Vorshlag getting the complete plumbing upgrade of the car knocked out. This is a big job happening on a compressed schedule. First they worked with our crew to get every device mounted, then mapped and planned the hoses, got the AN fittings ordered. Once the fittings arrived (including some they custom built for this application, to reduce adapters) each dedicated hose end fitting (+ adapter, if needed) was installed on each device. With these in place the individual hose lengths can be measured, then the complete hoses were built at the Pirtek shop, then the hose + fitting assembly was installed on the car at Vorshlag. This is normally a multi-thousand dollar plumbing upgrade - luckily Pirtek is a sponsor to Brianne's race effort.



The fuel filler tube hole is covered with a Hurst boot - yes, a manual shifter boot - and it works like a charm. The custom double-mount for the two fuel filters (pre- and post-surge tank pump) has rubber sheeting on both sides for vibration protection and bolts to a threaded fitting TIG-welded to the chassis (called a "weld nut"). The surge tank is mounted to the unibody through poly isolators as well.



Vorshlag's fabricator Ryan and assistant Cameron re-worked the initial shape of the strut tower brace (aka: the dual oil cooler mount) with larger 3/4" square tubes for the forward section. Pre-drilled brackets were tack-welded in place, the coolers were bolted to these, and the AN fittings were pre-installed for hose routing. Ed from Pirtek is shown laying out some hoses under the hood - he will be traveling with Ryan and Jason from Vorshlag to help support the Brianne Corn Racing effort during the week of the PPIHC event and will be joined by 4 more Vorshlag employees around race day as well as tuners from AWD Tuning. If it "takes a village to raise a child", it takes a crew of experts in their respective fields to help make a car capable of winning at PPIHC. It goes without mention that it also requires an awesome driver and navigator, too! We know that formula is there, with Brianne Corn and Jeremy Rowland. We are all so excited to see this driver, navigator and this car attack the mountain again!



With all of the fittings and hoses in hand, they got to work properly routing and plumbing it all. The RedHorse AN fittings look great, the hoses are all secured, the routing tweaked, and any hose that can rub against anything else will have some abrasion protective sleeve added.



I will show more of the under hood work after the new coolant expansion tank is added and the new coolant lines are plumbed. That's happening in the next few days. At the moment the entire fuel system and oiling lines are all upgraded and completed. We still have heat management issues we want to address, but that's a job for next week.


(see part 2 below)