Quote:
Originally Posted by rjrutzky
what's the time frame on these. I need something asap
|
It's gonna be a bit.
I was told in January 6-8 months.
Engineering is 4-6 weeks and production will vary. The dogbox stuff is simpler to make so less time for those for sure.
Be patient please
Don't want to take the cake out too soon
Once we decide on price, ratios and all the other bit and pieces will be decided.
The plan so far is a spur gear for 1-2 helical for 3-5, that will reduce the loading on the case.
-Phil @ F4M