View Single Post
Old 07-11-2019, 12:21 PM   #14
UncleFester
Scooby Newbie
 
Member#: 488783
Join Date: Jul 2018
Default

Quote:
Originally Posted by Ikibanchowda View Post
FWIW I think a week off is too optimistic. It took me way longer installing full bolt ons to my WRX than I expected

Realistically you should plan for a couple weeks off. My personal plan is to buy the IAG Stage 2 block, get some used heads and have them redone, assemble short block, then when the time comes swap out the long block and then you can sell your used heads/short block
Having another set of heads for the new shortblock would save a lot of time when it comes time to swap if I decide to have a shop clean mine up.

How much are you budgeting for used heads and shop refresh?
* Registered users of the site do not see these ads.
UncleFester is offline   Reply With Quote